oak harbor supply

Each trade bids differently, so each CRM gets different fields.

We work only with commercial specialty subcontractors. The core model is the same for all of them: general contractor, project, bid. What changes by trade is the fields, the follow-up timing and the reports the owner reads.

Low-angle view of a steel building frame against a clear sky

Electrical

Typical need

High ITB volume from many GCs, with tenant improvements, ground-up work and public projects mixed together. Owners want to know which GCs and project types are worth the takeoff hours.

How we set it up

  • +Project type field: TI, ground-up, public works, service upgrade
  • +Separate tracking for prevailing-wage and bonded bids
  • +Hit-rate report by GC and project type
  • +Addenda received checkbox before the submitted stage

HVAC and mechanical

Typical need

Bids often come with design-assist or alternate pricing, and the same project is bid to several GCs at once.

How we set it up

  • +One project record, multiple bids, one per GC
  • +Alternates and design-assist flags on the bid
  • +Site walk date pushed to the estimator's calendar
  • +Day 3 and day 10 follow-up tasks per GC

Plumbing

Typical need

Estimators juggle invites from GCs and from mechanical primes, and lose track of who the bid was sent to.

How we set it up

  • +Bid-to field: GC or mechanical prime
  • +Contact roles: PM, estimator, project engineer
  • +Lost reason required: price, scope, no response, GC not awarded
  • +Saved view of bids due this week per estimator

Roofing

Typical need

A mix of new commercial roofs and reroofs, with the GC relationship mattering as much as the price.

How we set it up

  • +Roof system and square footage fields on the bid
  • +Reroof versus new construction project type
  • +GC relationship notes and last-contact date
  • +Reminder when a submitted bid has no activity for 14 days

Concrete

Typical need

Short bid windows on tilt-up, slab and site work; the estimator who did the takeoff is often also the one who should call the GC.

How we set it up

  • +Due-date reminders at 5 days, 2 days and morning of
  • +Scope fields: slab on grade, tilt-up, site concrete, foundations
  • +Estimator ownership carried through follow-up
  • +Report of bids won versus GC award to another sub

Structural steel and misc metals

Typical need

Fewer, larger bids with long gaps between submission and award, where follow-up timing matters most.

How we set it up

  • +Tonnage and detailing-required fields
  • +Follow-up cadence stretched to day 7, 21 and 45
  • +Expected award date and GC award-status notes
  • +Pipeline value by quarter for the owner

Owners see which project types are worth bidding.

Why it matters. Takeoff hours are the scarcest resource in a subcontractor's office.

How it works. Because every bid carries a GC, a trade and a project type, hit rate can be cut three ways without exporting to Excel.

Multi-trade firms get one pipeline per trade, or one shared pipeline with a trade field, depending on whether estimators are shared.

Illustrative product interface

Not on this list? Glazing, drywall, fire protection and other specialty trades follow the same model. Tell us how you bid and we will say plainly whether it fits.

Talk about your trade